Process Piping

SEFEC ENGINEERING SEFEC ENGINEERING SEFEC ENGINEERING

We have proven capabilities for undertaking spools fabrication, field fabrication, erection and testing of process piping according to ANSI Codes. Major accomplishments are:

  • The maximum diameter of pipe installed is 2600mm for Circulating Water System at 1 x 250 MW Oil Fired Thermal Power Plant Project, Jamshoro.

  • The thickest pipe (36mm thick) fabricated and installed for down- comer of Aux. Boiler at FFC-2 plant Expansion Project (Material chrome + moly).Fabricated piping spool and installed liquid jacketed pipeline for Dakhni Development Project (OGDC).

  • Fabricated piping spool and installed liquid jacketed pipeline for Dakhni Development Project (OGDC).